Tuesday 26 April 2016

Best Practices for Site System Design

When planning and designing a Configuration Manager 2012 site hierarchy, you also need to place your site system roles on the right server. Depending on the role and the size of the site, the role can consist of other roles on one or more site servers. This section will provide information about some best practices for capacity planning of Configuration Manager 2012. 

Capacity Planning of Configuration Manager2012Table  lists the maximum recommendations for planning and designing your Configuration Manager 2012 infrastructure. The actual figures depend on your available hardware, your network infrastructure, and also on your demands.

Site System
Number
Description
Clients
400,000
This is the maximum number of clients supported for the entire Configuration Manager 2012 hierarchy.
Primary site
25
 A Central Administration Site supports up to 25 child primary sites.
Primary site
100,000
A primary site supports up to 100,000 clients.
Secondary site
250
There is a maximum of 250 secondary sites per primary site.
Secondary site
5,000
A secondary site can support communications from up to 5,000 clients.
Management point
10
A primary site can support up to 10 management points.
Management point
25,000
One management point can support up to 25,000 clients.
Distribution point
4,000
A distribution point is capable of supporting up to 4,000 clients.
Distribution point
250
A site can hold up to 250 distribution points.
Pull distribution point
2,000
Each primary and secondary site supports up to 2,000 pull distribution points.
PXE-enabled distribution points
250
Up to 250 PXE-enabled distribution points are supported per primary site.
Software update point
25,000
If the software update point runs on the WSUS server and other site roles coexist, the software update point supports up to 25,000 clients.
Software update point
100,000
If the software update point runs on the WSUS server and no other site roles coexist, the software update point supports up to 100,000 clients.
System health validator
point
100,000
The system health validator point in Configuration Manager 2012 supports up to 100,000 clients or one per hierarchy if fewer than 100,000 clients.
Fallback status point
100,000
The fallback status point in Configuration Manager 2012 supports up to 100,000 clients or one per site.
Application Catalog  website point
400,000
One Application Catalog website point supports up to
400,000 clients, but for better performance, plan for 50,000 clients per point.
Application Catalog web service point
400,000
One Application Catalog web service point supports up to 400,000 clients. Best practice is to place the website point and web service point on the same server.
Packages and applications per distribution point
10,000
Per distribution point supports up to 10,000 packages and applications.

No comments:

Post a Comment